REVEALDM SOLENE Design Change Register
🔔 0 Logged in as

Notifications

PROJECTS SAMPLES DIRECTORY

REGISTER

Escalation approvals

DCR FORM

Submission · sign-off · simulated print + email on completion

CONSULTANTS

Read-only · consultants & their disciplines are managed in the platform's Project Directory and sync in on load Discipline · company (from PACE library) · other PACE projects · primary contact
Add / edit in Project Directory
Discipline Company (on Solene) Other PACE Projects Primary Contact Email

SETTINGS · SOLENE

Project info · approval workflow · thresholds · defaults · changes save automatically

Consultants & project details

The consultant library and project details (number, name, address, type) are managed in the platform: consultants in the Project Directory, and project details in My Projects on the dashboard. This register consumes them.

Approval Workflow

Who signs, and in what order
Order:
Order Role Entity Approver Channel Tier

Who holds each slot, and which slots exist. A slot that has been signed cannot be removed. Delegate lets a colleague from the same company sign while the approver is away; a single DCR can also be handed on from its form.

👥 External Client sign-off Add a 5th approver block for the project's external client (Fabbrica, future jobs).

Escalation · Auto-Approval

Above this value the DCR requires auto-approval sign-off
On while an Escalation slot exists in the Approval Workflow above. To turn it off, remove that slot or change its tier; there is no separate switch.
Chosen from the Project Directory · signs when over threshold
$ Default $10,000 · configurable per project

Optional Columns

Toggle on to add to Register + Form
Very High / High / Medium / Low / N/A
Yes / No (Yes = red · No = green)
Cost Impact + Variation Cost columns
Planning implications column
Contract of Sale implications column

Defaults

Behaviour for new DCRs
Stamped automatically when a DCR is submitted for review.
days in Pending Cost Review or awaiting approval before a reminder email goes out (Monday and Wednesday mornings). The same setting as on Samples.

Danger Zone

Wipes DCRs, settings, audit, gaps. Reseeds on next load.

NOTIFICATIONS

Outbox · what the system queued, sent, skipped or failed

AUDIT

Append-only change log · every cell edit + status transition + approval action
· entries

HELP

Who can do what · how a design change moves · what the statuses mean
ADMINISTRATORProject lead

What you can do

  • Everything an Editor can
  • Invite people and set their role, from the Directory or the Register
  • Change live Settings: the escalation threshold, the chaser interval and which optional columns show
  • Host a DCR Meeting and record who attended
  • Read the Notifications tab, which lists every email queued, sent or skipped
  • Sign any approval slot you are the named signer on

What you can’t

  • Sign a slot that names someone else, even as administrator
  • Edit or remove a signature, a comment or an audit entry
EDITORStaff raising and maintaining DCRs

What you can do

  • Raise a DCR and edit every register cell: title, description, discipline, cost impact, priced value, planning and contract flags, comments
  • Attach drawings and pricing evidence, on the Register paperclip or the Form
  • Withdraw a DCR that is no longer pursued, and Reopen it later
  • Start a revision after a rejection
  • Export the register to CSV, print a DCR notice

What you can’t

  • Sign approvals, unless you are also named on a slot
  • Change Settings, invite people or host a meeting
APPROVERNamed signers: Development, Architect, Builder, Escalation

What you can do

  • Sign the slot that names you, from the DCR Form or in a DCR Meeting hosted by an administrator
  • Use Awaiting me on the Form tab to see what is waiting for your signature
  • Read every DCR, its drawings, pricing evidence, approvals and audit trail
  • Attach a marked-up drawing: uploading is open to every member, so a sketch does not have to go by email
  • Print a DCR notice

What you can’t

  • Edit register cells or raise a DCR
  • Sign a slot named to someone else
READ-ONLYAlso Consultant and Subcontractor memberships

What you can do

  • View the Register, every DCR Form, the Audit trail and the Directory
  • Search and filter across all of it
  • Export to CSV

What you can’t

  • Change anything, or sign

Consultant and Subcontractor memberships work the same way, plus any approval slot they are named on.

Raising a DCR

Click + New DCR on the Register. The number is allocated by the database the moment you click, so numbers are never reused; a gap in the sequence means a DCR was started and abandoned, and that is normal. Fill in the title, the description of the change and the original design, pick Raised by and the Discipline affected, then set the Cost impact.

Pricing and escalation

A DCR with a cost impact sits at Pending Cost Review until a Priced value is entered. Once priced, the database decides who has to sign: at or below the escalation threshold in Settings, the three standing approvers; above it, the Escalation slot is required as well and the status reads Approval Required. Change the threshold and every DCR re-routes; nothing needs re-entering.

Before anyone can sign

A drawing must be attached. The Form shows what is blocking sign-off rather than hiding the buttons. Approvers sign in any order; the register is set to parallel approval, and only a project administrator can change that.

Rejection and revision

A rejection sets the status to Rejected and notifies whoever raised it. To go again, open the Form and start a revision: the revision number goes up, the earlier signatures stay in the record, and the DCR returns to the workflow from its current cost impact. Reopening a withdrawn DCR also starts a new revision, so reviewers can tell that parked information was re-checked.

When everyone has signed

The DCR is Approved, or Approved with comments if any signer added conditions. Print the notice from the Form: it carries the approval record, who printed it and when, and a statement that it is a copy of a register record rather than a contractual document.

DCR Meeting

An administrator hosts a meeting from the Register, ticks who is in the room, and walks through the DCRs awaiting the host’s own signature. Attendance is recorded in the minutes. Other people’s slots still need their own login; the meeting shows what is still outstanding and who it waits on.

What the statuses mean

Status is worked out by the database from the priced value and the signatures on the current revision. Nobody sets it by hand.

StatusMeaning
TBCCost impact not yet chosen
Pending Cost ReviewHas a cost impact, not yet priced
Pending ReviewPriced at or below the threshold; waiting on the standing approvers
Approval RequiredPriced above the threshold; the Escalation slot must sign too
Approved / Approved w/ CommentsEvery required slot has signed on the current revision
RejectedA signer rejected the current revision; start a revision to continue
WithdrawnTaken out of the workflow; can be reopened as a new revision

How signing works, on both registers

Every approval slot is held by one named person. Only that person can sign it, from their own login, whoever is holding the device. There is no delegation yet: if the named signer is away, the slot waits.

Signing opens a short ceremony: read the attestation, tick that you adopt the typed name as your signature, type your name, then choose Approve, Approve with comments or Reject. The last two require a comment, and the comment is part of the signed record. The Sign button stays grey until the name is typed and the box is ticked.

The database, not the browser, stamps the time and seals each signature into a hash chain for the project. Signatures are never edited or deleted. A new revision starts the approvals again; earlier signatures stay in the record at their own revision and simply stop counting.

Verify seal, on the Audit tab, re-walks that chain and reports every signature it checked. It proves nothing has changed since signing. It does not, on its own, prove a signature to an outside party, and during the pilot the existing email and spreadsheet process remains the contractual record.

Notifications are a prompt, not the record

Emails come from REVEAL DM <noreply@notifications.revealdm.com> and replies reach a person. If an email is late or missing, nothing is lost: the register itself is authoritative, and the Awaiting me filter on the Form tab is the reliable list of what needs your signature.

Changes made by colleagues appear on your screen as they happen. If something looks stale, reload the page.